ADR-003: Budget as discrete segments with nearest-segment fallback

Status: Accepted

Quality requirements addressed: QR-002

Context

Users choose a budget tier. Internally each product has a segment of low, mid, or high. The catalog is small and uneven — some routine steps have no product in a given segment (for example, the high segment has very few products). An earlier design that forced the basket total into a hard price band made budget=high fail outright when a segment could not be filled, and the customer's intent (per the project brief) is that budget should act as a soft preference with a graceful fallback, not a hard gate — catalog prices also drift over time, so exact price bands are not a durable constraint.

Decision

Treat budget as discrete segments with nearest-segment fallback, not as free-form price optimization. For each routine step the engine searches the user's own segment first, then the nearest neighbour(s) on the low < mid < high scale (the explicit SEGMENT_PRIORITY table in recommend.py). A step is left empty only when no segment has a candidate. When a product is taken from a segment other than the requested one, the response notes the substitution. Price bands are informational labels, not load-bearing constraints on the assembled total.

Consequences and tradeoffs

  • Positive (QR-002): the engine degrades gracefully across the whole valid input space instead of failing on sparse combinations — budget=high now falls back per step rather than returning a blanket error, and a genuinely empty result surfaces as a structured 422 NO_PRODUCTS_AVAILABLE.
  • Positive: the fallback only relaxes the segment; it never relaxes the hard filters (vegan, cruelty-free, allergens), which are applied before selection.
  • Tradeoff (resolved at the presentation layer via PBI-302): because price bands are not enforced, the assembled total does not land inside a fixed ₽ range — with ~6 items per bag, the sum overshoots a per-item tier. PBI-302 measured this against the real catalog and decided to keep this engine unchanged and fix the mismatch in presentation: the questionnaire now frames budget as a tier with an approximate per-product price and an approximate total, and the results show the real computed total with an "approximate price" note, instead of promising an exact basket range. This ADR is therefore retained, not superseded. A true total-budget model would only make sense with reliable price data and would need a new ADR superseding this one.